TY - JOUR
T1 - Strategic planning of new product introductions
T2 - Integrated planning of products and modules in the automotive industry
AU - Bersch, Christopher V.
AU - Akkerman, Renzo
AU - Kolisch, Rainer
PY - 2021/7/2
Y1 - 2021/7/2
N2 - Timing the introduction of new products to the market is an important strategic decision in the automotive industry. For several reasons, it is also a complex decision problem. First, the use of platforms creates many interactions between different vehicles via shared modules (e.g. engines). Second, new and existing products rely on various shared resources (e.g. development resources or production capacities). Furthermore, different conflicting objectives must be considered. In this paper, we develop a mathematical linear programming model describing the decision problem based on the resource-constrained project scheduling problem. It simultaneously decides on the start of production date for vehicle models, variants, and engines as well as on the assignment of engines to the given variants. Integrating a multi-criteria approach, the model helps to analyze trade-offs between important managerial objectives related to resource utilization and fleet emission metrics. Using realistic data from a major European automotive company, we demonstrate that our model enables the efficient evaluation of various courses of action. Such capabilities are especially relevant in times of rapid technological change, such as the current transition towards electrified vehicle portfolios
AB - Timing the introduction of new products to the market is an important strategic decision in the automotive industry. For several reasons, it is also a complex decision problem. First, the use of platforms creates many interactions between different vehicles via shared modules (e.g. engines). Second, new and existing products rely on various shared resources (e.g. development resources or production capacities). Furthermore, different conflicting objectives must be considered. In this paper, we develop a mathematical linear programming model describing the decision problem based on the resource-constrained project scheduling problem. It simultaneously decides on the start of production date for vehicle models, variants, and engines as well as on the assignment of engines to the given variants. Integrating a multi-criteria approach, the model helps to analyze trade-offs between important managerial objectives related to resource utilization and fleet emission metrics. Using realistic data from a major European automotive company, we demonstrate that our model enables the efficient evaluation of various courses of action. Such capabilities are especially relevant in times of rapid technological change, such as the current transition towards electrified vehicle portfolios
KW - Mixed integer programming
KW - Modularization
KW - Resource utilization
KW - Strategic planning and management
U2 - 10.1016/j.omega.2021.102515
DO - 10.1016/j.omega.2021.102515
M3 - Article
AN - SCOPUS:85110029637
SN - 0305-0483
VL - 105
JO - Omega (United Kingdom)
JF - Omega (United Kingdom)
M1 - 102515
ER -