Projects per year
Abstract
As part of the ‘Surface Waters Decision Tree’ project a new authorisation procedure for plant protection products (PPPs) has been developed. The feedback of monitoring results in the authorisation procedure consists of 3 main steps: 1. Identification and ranking of problematic substances 2. Analysis of plausible causes 3. Feedback procedure In this report, a methodology for all three steps is described
Original language | English |
---|---|
Place of Publication | Randwijk |
Publisher | Praktijkonderzoek Plant & Omgeving |
Number of pages | 85 |
Publication status | Published - 2011 |
Publication series
Name | Report / Applied Plant Research |
---|---|
Publisher | Praktijkonderzoek Plant & Omgeving Bloembollen, Boomkwekerij en Fruit |
No. | nr. 2011-02 |
Keywords
- ornamental bulbs
- forest nurseries
- fruit growing
- plant protection
- water quality
- environmental protection
- protocols
Fingerprint
Dive into the research topics of 'Interpretation of surface water monitoring results in the authorisation procedure of plant protection products in the Netherlands'. Together they form a unique fingerprint.Projects
- 1 Finished
-
Instrumentaria interpretatie monitoringsresultaten ikv NL toelating en KRW (BO-12.07-002-004)
de Werd, R. (Project Leader)
1/01/10 → 31/12/11
Project: LVVN project