Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations

C.S.L. Kusters, M. Wieriks, B. Dwi Andari, N. Suprobo, W. Priyahita, R.R. Sihombing, S.W. Rokhmatulloh, I. Rosita

Research output: Book/ReportReportProfessional

Abstract

This report presents the findings of the endline of the evaluation of the organisational capacity component of the MFS II country evaluations. The focus of this report is Indonesia, ASB. The format is based on the requirements by the synthesis team and NWO/WOTRO. The endline was carried out in 2014. The baseline was carried out in 2012.
Original languageEnglish
Place of PublicationWageningen
PublisherCentre for Development Innovation, Wageningen UR
Number of pages96
Publication statusPublished - 2015

Publication series

NameReport / Wageningen UR, Centre for Development Innovation
PublisherCentre for Development Innovation, Wageningen UR
No.CDI-15-042

Keywords

  • organizations
  • organizational development
  • empowerment
  • development projects
  • indonesia
  • south east asia
  • asia

Cite this

Kusters, C. S. L., Wieriks, M., Dwi Andari, B., Suprobo, N., Priyahita, W., Sihombing, R. R., ... Rosita, I. (2015). Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations. (Report / Wageningen UR, Centre for Development Innovation; No. CDI-15-042). Wageningen: Centre for Development Innovation, Wageningen UR.
Kusters, C.S.L. ; Wieriks, M. ; Dwi Andari, B. ; Suprobo, N. ; Priyahita, W. ; Sihombing, R.R. ; Rokhmatulloh, S.W. ; Rosita, I. / Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations. Wageningen : Centre for Development Innovation, Wageningen UR, 2015. 96 p. (Report / Wageningen UR, Centre for Development Innovation; CDI-15-042).
@book{cabadd41953744b3aae1bc1dd47f6432,
title = "Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations",
abstract = "This report presents the findings of the endline of the evaluation of the organisational capacity component of the MFS II country evaluations. The focus of this report is Indonesia, ASB. The format is based on the requirements by the synthesis team and NWO/WOTRO. The endline was carried out in 2014. The baseline was carried out in 2012.",
keywords = "organizations, organizational development, empowerment, development projects, indonesia, south east asia, asia, organisaties, organisatieontwikkeling, empowerment, ontwikkelingsprojecten, indonesi{\"e}, zuidoost-azi{\"e}, azi{\"e}",
author = "C.S.L. Kusters and M. Wieriks and {Dwi Andari}, B. and N. Suprobo and W. Priyahita and R.R. Sihombing and S.W. Rokhmatulloh and I. Rosita",
year = "2015",
language = "English",
series = "Report / Wageningen UR, Centre for Development Innovation",
publisher = "Centre for Development Innovation, Wageningen UR",
number = "CDI-15-042",

}

Kusters, CSL, Wieriks, M, Dwi Andari, B, Suprobo, N, Priyahita, W, Sihombing, RR, Rokhmatulloh, SW & Rosita, I 2015, Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations. Report / Wageningen UR, Centre for Development Innovation, no. CDI-15-042, Centre for Development Innovation, Wageningen UR, Wageningen.

Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations. / Kusters, C.S.L.; Wieriks, M.; Dwi Andari, B.; Suprobo, N.; Priyahita, W.; Sihombing, R.R.; Rokhmatulloh, S.W.; Rosita, I.

Wageningen : Centre for Development Innovation, Wageningen UR, 2015. 96 p. (Report / Wageningen UR, Centre for Development Innovation; No. CDI-15-042).

Research output: Book/ReportReportProfessional

TY - BOOK

T1 - Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations

AU - Kusters, C.S.L.

AU - Wieriks, M.

AU - Dwi Andari, B.

AU - Suprobo, N.

AU - Priyahita, W.

AU - Sihombing, R.R.

AU - Rokhmatulloh, S.W.

AU - Rosita, I.

PY - 2015

Y1 - 2015

N2 - This report presents the findings of the endline of the evaluation of the organisational capacity component of the MFS II country evaluations. The focus of this report is Indonesia, ASB. The format is based on the requirements by the synthesis team and NWO/WOTRO. The endline was carried out in 2014. The baseline was carried out in 2012.

AB - This report presents the findings of the endline of the evaluation of the organisational capacity component of the MFS II country evaluations. The focus of this report is Indonesia, ASB. The format is based on the requirements by the synthesis team and NWO/WOTRO. The endline was carried out in 2014. The baseline was carried out in 2012.

KW - organizations

KW - organizational development

KW - empowerment

KW - development projects

KW - indonesia

KW - south east asia

KW - asia

KW - organisaties

KW - organisatieontwikkeling

KW - empowerment

KW - ontwikkelingsprojecten

KW - indonesië

KW - zuidoost-azië

KW - azië

M3 - Report

T3 - Report / Wageningen UR, Centre for Development Innovation

BT - Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations

PB - Centre for Development Innovation, Wageningen UR

CY - Wageningen

ER -

Kusters CSL, Wieriks M, Dwi Andari B, Suprobo N, Priyahita W, Sihombing RR et al. Endline report – Indonesia, Aliansi Sumut Bersatu MFS II country evaluations. Wageningen: Centre for Development Innovation, Wageningen UR, 2015. 96 p. (Report / Wageningen UR, Centre for Development Innovation; CDI-15-042).