Projects per year
Projects
- 2 Finished
Search results
-
Finished
TU16032 Optimizing 10x technology (BO-56-201-001, BO-50-003-001, BO-25.08-003-001)
1/01/17 → 31/12/20
Project: EZproject
-
KV 1605-118 Building the green HapMap (BO-50-002-030, BO-26.03-009-005)
1/01/17 → 31/12/19
Project: EZproject